1 Based on the measures plan, the cantonal authority shall order the remediation of hydropeaking and require the persons responsible for hydropower plants to examine various types of remediation measure in order to implement the plan.
2 Before it decides on the remediation project, it shall consult the FOEN. With a view to an application under Article 30 paragraph 1 of the Energy Ordinance of 1 November 201761 (EnO), the FOEN shall verify whether the criteria of Annex 3 number 2 EnO are met.62
3 The persons responsible for hydropower plants shall verify the effectiveness of the measures taken as required by the authority.
62 Second sentence amended by Annex 7 No II 2 of the Energy Ordinance of 1 Nov. 2017, in force since 1 Jan. 2018 (AS 2017 6889).
1 Sulla base della pianificazione delle misure, l’autorità cantonale dispone i risanamenti dei deflussi discontinui e impone ai detentori di centrali idroelettriche di esaminare diverse varianti di misure di risanamento in vista dell’attuazione della pianificazione.
2 Prima di prendere una decisione in merito al progetto di risanamento, l’autorità consulta l’UFAM. In vista della domanda di cui all’articolo 30 capoverso 1 dell’ordinanza del 1° novembre 201763 sull’energia (OEn), l’UFAM verifica l’adempimento dei requisiti di cui all’allegato 3 numero 2 OEn.64
3 Su richiesta dell’autorità, i detentori di centrali idroelettriche esaminano l’efficacia delle misure adottate.
64 Nuovo testo del per. giusta il n. II 2 dell’all. 7 all’O del 1° nov. 2017 sull’energia, in vigore dal 1° gen. 2018 (RU 2017 6889).