1 For buildings and system components that require a permit in accordance with the conditions of the construction licence, ENSI shall grant permits:32
2 To obtain the necessary permit, applicants must submit all the documentation necessary for the assessment as aforementioned in Annex 4.
3 ENSI shall regulate the type, content, presentation and number of required application documents in guidelines.33
32 Amended by Annex No 12 of the O of 12 Nov. 2008 on the Swiss Federal Nuclear Safety Inspectorate, in force since 1 Jan. 2009 (AS 2008 5747).
33 Amended by Annex No 12 of the O of 12 Nov. 2008 on the Swiss Federal Nuclear Safety Inspectorate, in force since 1 Jan. 2009 (AS 2008 5747).
1 Per quanto concerne gli edifici e le parti dell’impianto che necessitano del nullaosta conformemente alla licenza di costruzione, l’IFSN rilascia il nullaosta per:32
2 Per ottenere il nullaosta, il richiedente deve inoltrare la documentazione necessaria per la valutazione della domanda come previsto nell’allegato 4.
3 L’IFSN è incaricato di disciplinare mediante direttive il genere, il contenuto, la forma e il numero di esemplari della necessaria documentazione.33
32 Nuovo testo giusta l’all. n. 12 dell’O del 12 nov. 2008 sull’Ispettorato federale della sicurezza nucleare, in vigore dal 1° gen. 2009 (RU 2008 5747).
33 Nuovo testo giusta l’all. n. 12 dell’O del 12 nov. 2008 sull’Ispettorato federale della sicurezza nucleare, in vigore dal 1° gen. 2009 (RU 2008 5747).
This document is not an official publication. Only the publication of the Federal Chancellery is legally binding.
Il presente documento non è una pubblicazione ufficiale. Fa unicamente fede la pubblicazione della Cancelleria federale. Ordinanza sulle pubblicazioni ufficiali, OPubl.