1 The cantons shall determine responsibilities and procedures.
1bis They shall determine the time limits and their consequences for all procedures involved in the erection or modification of buildings or installations, or changes to their purpose.70
2 In the case of any building projects outside the building zones the competent cantonal authority shall decide if they meet zone requirements or if an exceptional permit may be issued.71
70 Inserted by No I of the FA of 6 Oct. 1995 (AS 1996 965; BBl 1994 III 1075) Amended by No I of the FA of 20 March 1998, in force since 1 Sept. 2000 (AS 2000 2042; BBl 1996 III 513).
71 Amended by No I of the FA of 20 March 1998, in force since 1 Sept. 2000 (AS 2000 2042; BBl 1996 III 513).
1 Les cantons règlent la compétence et la procédure.
1bis Ils impartissent des délais dont ils règlent les effets dans toutes les procédures requises pour implanter, transformer ou changer d’affectation les constructions et installations.70
2 Pour tous les projets de construction situés hors de la zone à bâtir, l’autorité cantonale compétente décide si ceux-ci sont conformes à l’affectation de la zone ou si une dérogation peut être accordée.71
70 Introduit par le ch. I de la LF du 6 oct. 1995 (RO 1996 965; FF 1994 III 1059). Nouvelle teneur selon le ch. I de la LF du 20 mars 1998, en vigueur depuis le 1er sept. 2000 (RO 2000 2042; FF 1996 III 485).
71 Nouvelle teneur selon le ch. I de la LF du 20 mars 1998, en vigueur depuis le 1er sept. 2000 (RO 2000 2042; FF 1996 III 485).